Disclaimer

  • Removing floor coverings usually produces a substantial amount of dust. Where practicable dust extraction units are used however this will not completely remove all airborne dust. It is the client/homeowners responsibility to adequately prepare for the works.

  • Ezy Strip may quote over the phone site unseen. We will assume the client has accurately measured the area to be removed. If the area is larger or there are multiple layers of flooring on top of each other the original quote may be exceeded.

  • Removing floor coverings produces large amounts of noise. Ezy Strip recommends neighbours are notified in advance. This should apply especially in an apartment complex or any building with common or adjoining walls including duplexes.

  • The act of removing your floor or wall coverings may cause damage to the pad/sub floor or wall render. If the sub floor or render is inadequate for any reason further work may need to be suspended until the owner or client is notified. Ezy Strip will not be liable for the cost of any repairs or damage that may have been caused by an inadequate or deficient pad or sub floor and wall render.

  • Customer to provide adequate 240V power, and access to unlocked meter box.

  • Plaster wall/paint//skirting damage may occur, absolutely all care is taken but due to the nature of tiles breaking/chipping up and the floor removal process in general this sometimes cannot be prevented and is the responsibility of the client to rectify.

  • Ezy Strip requires unobstructed access to the work area/s and for all objects in the work area to be completely cleared (including walls) prior to work being undertaken. Utmost care will be taken however Ezy Strip will not be liable for any damage incurred to items left in or near the work area, Furthermore, Ezy Strip may add labour charges if any item/s (including fridges, dishwashers, tv units, sofas etc..) require moving in order to carry out the works.

  • In commercial/industrial premises it may be advantageous to remove floors after hours. This will lessen the risk of complaints from neighbours and the possible suspension of work. If work is suspended for any reason or period including complaints Ezy Strip reserves the right to charge for standby time.

  • Any cancellation or rescheduling of any works due to be performed by Ezy Strip must be received no later than 72 hours before the scheduled start time to ensure no minimum charge or additional fees are payable by the client.

  • Payments are to be made no later than 72 hours after the invoice stated date by direct deposit, cheque, bank cheque or cash to Ezy Strip. Any late payments after a period of one (1) week will incur a 2% increase on the invoiced amount, plus additional administration fees and interest charges. Any expenses, costs and/or disbursements incurred by Ezy Strip in recovering outstanding monies, including debt collecting fees and solicitors' costs, shall be paid by the client.

Follow Me On

Testimonials

Merill Carter

Concrete Grinding Before

Concrete Grinding After